Contact us For Price
Description

Pareena Coban Residences

Apartment - Pareena Coban Residences,Sector-99A,Gurgaon Haryana

 




Pareena Coban Residences is a state of the art residential project developed by Pareena Infrastructure located at Gurgaon. The project has lavishly built 2 BHK, 3 BHK and 4 BHK apartments with modern interiors. Basic amenities such as swimming pool, world class gym, indoor games arena, amphitheatre and round the clock security are an added bonus provided to residents. Connectivity to major schools, hospitals, railway stations, banks and shopping malls is easy via well laid roads.

  • floor plan

FEATURES OF THE PROJECTS

  • Indoor Games Arena – Pool Table, Table Tennis, Cards, Carrom
  • Badminton / Volleyball / Basketball Court
  • Open Amphitheater, Party Venue
  • Jogging / Cycling Track
  • Swimming pools , gym , jogging and walking tracks , skating rink.
  • Children’s Crèche / Play Area
  • Round The Clock Security (24/365)
  • Club house with all modern amenities

Pareena Coban Residences: Specifications

Living /Dining Room
Flooring Vitrified Tiles
Wall Oil Bound Distemper
Ceiling POP Carnice
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/UPVC with matching Fitting
Electrical Modular Switches, TV & Telephone Sockets
Master Bedroom
Flooring Laminated Wooden Flooring
Wall Oil Bound Distemper
Ceiling POP Carnice.
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/UPVC with matching Fitting
Electrical Modular Switches, TV & Telephone Sockets
Other Bedrooms
Flooring Vitrified Tiles
Wall Oil Bound Distemper
Ceiling POP Carnice.
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/UPVC with matching Fitting
Electrical Modular Switches, TV & Telephone Sockets
Kitchen
Flooring Ceramic Tiles
Wall Ceramic Tiles upto 2” height above kitchen platform
Ceiling Oil Bound Distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/UPVC with matching Fitting
Platform Pre-polished Granite Platform with Stainless Steel Sink
Fittings/Fixtures CP Fittings,
Wood Work Moudular Kitchan
Electrical Modular Switches
Toilets
Flooring Ceramic Tiles
Wall Ceramic/Glazed Tiles upto 7” height
Ceiling Oil Bound Distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/UPVC with matching Fitting
Counter Granite Counter top with Wash Basin
Sanitary ware/CP Fittings CP Fittings, European Style with branded chrome plated brass fittings (white/colour)
Electrical Modular Switches
Balcony
Flooring Ceramic Decorative tiles
Wall Semi Permanent,Long Lasting Finish
Door Flush Door/UPVC
Windows/Glazing Hardwood/UPVC with matching Fitting
Electrical Modular Switches
Servant Room
Flooring Ceramic  Tiles
Wall Oil Bound Distemper
Ceiling Oil Bound Distemper
Door Hardwood frames & Flush doors finished with paints
Windows/Glazing Hardwood/UPVC with matching Fitting
Electrical Modular Switches, TV & Telephone Sockets
Toilet Ceramic  Tiles Flooring, CP Fittings
Special Features
Main Entrance door shall be Decorative Flush Door
Intercome System

Construction Linked Plan
Payment Milestone Details
At The Time Of Booking  
Within 30 Days of Booking 20% of BSP
On Start of Excavation 10% of BSP + 25% of EDC/IDC
On Completion of Stilt Floor Roof Slab 7.50% of BSP + 25% of EDC/IDC
On Competion of 3rd Floor Roof Slab 7.50% of BSP + 25% of EDC/IDC
On Completion of 6th Floor Roof Slab 7.50% of BSP + 25% of EDC/IDC
On Completion of 9th Floor Roof Slab 7.50% of BSP + 100% of PLC
On Completion of 12th Floor Roof Slab 7.50% of BSP + 1,00,000 of Parking Open + 1,75,000 of PARKING Covered
On Completion of 15th Floor Roof Slab 7.50% of BSP + 1,00,000 of Parking Open + 1,75,000 of PARKING Covered
On Completion of 18th Floor Roof Slab 5% of BSP
On Completion of Top Floor Roof Slab 5% of BSP
On Completion of Brick Work 5% of BSP
On Completion of Flooring 5% of BSP
On Offer of Possession 5% of BSP + 1,25,000 of Power Backup Three BHK + 1,50,000 of Power Backup Four BHK + 2,00,000 of CLUB MEMBERSHIP CHARGES + 100% of IFMS

 

OTHER CHARGES :

Other Charge Name Price
Central Green Facing 5% of BSP
CLUB MEMBERSHIP CHARGES 2,00,000
EDC/IDC 491 Per Unit Super Area
Fifth-Sixth Floor 3% of BSP
IFMS 50 Per Unit Super Area
PARKING Covered 3,50,000
Parking Open 2,00,000
Podium 4% of BSP
Pool and Green Facing 4% of BSP
Power Backup Four BHK 1,50,000
Power Backup Three BHK 1,25,000
Power Backup Two BHK 1,00,000
Seventh-Eight Floor 2% of BSP
Three Side Open 2% of BSP
Property Features
  • Apartment
© Copyright 2018 - 2018 | NGLC REALTECH | Development & Digital Marketing by Nurotech | All Rights Reserved |