Contact us For Price
Description

Paras Irene

Apartment - Paras Irene, Sector-70A,Gurgaon Haryana

 




Paras Irene is a residential project developed by Paras Buildtech. The project offers well designed 2BHK, 3BHK and 4BHK apartments at very affordable prices. The project is well connected by various modes of transportation. The site is in close proximity to various civic utilities.

Project Details

  • Total Area : 8 Acres
  • No of Blocks: 7
  • No of Floors: 14
  • Total Units : 434

  • FLOOR PLANS
  • FLOOR PLANS

FEATURES OF THE PROJECTS

  • Reserved area for children playground.
  • Highly modern and well equipped gymnasium.
  • Landscaped garden for nature lovers.
  • Health club facilities on campus itself.
  • Swimming pools , gym , jogging and walking tracks , skating rink.
  • Ultra-modern swimming pool.
  • Synthetically developed jogging park.
  • Club house with all modern amenities

Mapsko Mount Ville : Gurgaon Sector 79 : Specifications

LIVING & DINING AREA
Flooring Imported Marble / Engineer Stone / Aglow Stone
Wall Plastic Emulsion
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up
Others Split AC Unit
MASTER BEDROOM
Flooring Laminated Wooden Flooring
Wall Plastic Emulsion
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up
Others Split AC Unit
OTHER BEDROOM
Flooring Laminated Wooden Flooring
Wall Plastic Emulsion
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up
Others Split AC Unit
KITCHEN
Flooring Anti skid Tiles
Wall Ceramic Tiles
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up
Others Stone Counter With SS Sin
TOILET
Flooring Anti skid Tiles
Wall Ceramic Tiles
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up
Others Stone Counter With Wash basin, EWC & CP Fittings
UTILITY
Flooring Anti skid Tiles
Wall External Paints
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up
BALCONY
Flooring Anti skid Tiles
Wall External Paints
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up
SERVANT TOILET
Flooring Ceramic Tiles
Wall Oil Bond Distemper
Ceiling Oil Bond Distemper
Door Internal : Seasonal Hardwood Frames & European Shutter
External : UPVC / Power Coted Aluminium Doors
Window / Glazing Aluminium / UPVC
Electrical Three Phase Supply With Independent Master, 100 % Power Back up

Payment Plan
(A) Construction Linked Plan (CLP)
At the time of Booking 7.5 Lacs/10 Lacs
Within 60 days of Booking 20% of BSP (Inclusive of booking Amount)
On start of Excavation 10% of BSP + 50% of Car Parking
On Completion of Upper Basement Roof Slab 10% of BSP + 50% of Car Parking
On Completion of 3rd floo 10% of BSP + 50% of PLC
On Completion of 7th floor 10% of BSP + 50% of PLC
On Completion of Top floor 10% of BSP + 50% of EDC& IDC
On Completion of Brick work 10% of BSP + 50% of EDC& IDC
On Completion of Internal Plaster 7.5% of BSP
On Completion of Flooring 7.5%of BSP & IFMS
On offer of Possession 5% of BSP + Club Membership +Stamp Duty +

Registration Charges

(B) Down Payment Plan (DPP)
At the time of booking 7.5 Lacs/10 Lacs
Within 45 days of booking 85% of Basic Sale Price + Parking Charges + PLC
On offer of Possession 5% of Basic Sale Price + EDC + IDC + IFMS +

Registration and Stamp Duty Charges (as applicable)


Floor

Construction Link Plan (CLP) Rs/sqft

Flexi Plan (FP) Rs/sq ft

Down Payment (DP) Rs/sqft

GROUND
4100 4000 3900

1st & 2nd Unit
4050 3950 3850

3rd & 4th Unit
4000 3900 3800

5th & 6th Unit
3950 3850 3750

7th & 8th Unit
3900 3800 3700
Property Features
  • Apartment
© Copyright 2018 - 2018 | NGLC REALTECH | Development & Digital Marketing by Nurotech | All Rights Reserved |