Contact us For Price
Description

Ireo Grand Arch

House - Ireo Grand Arch, Sector-58,Gurgaon Haryana

 




Ireo Developer is developing another landmark project The Grand Arch in Sector 58, Gurgaon. The project is spread across 20 acres. The Grand Arch’s unique architecture and use of state-of-the-art technology and devices will set unparalleled benchmarks of luxury, convenience and comfort for the residents. Each apartment is skillfully designed to utilize the maximum space and equipped with all modern amenities to cater the needs of the residents. The project offers 2, 3 and 4 BHK apartments at affordable price. It is easily accessible from important landmarks in the city. All apartments are open on four side to enjoy the natural beauty of the city. The Grand Arch is truly created to achieve the next level of living.

Project Details

  • Airport: 30.0 kms
  • Railway Station: 1.0 kms
  • Hospital: 2.0 kms
  • City Center: 2.0 kms
  • School: 2.0 kms
  • ATM: 2.0 kms
  • Key Landmark: Ireo City Golf Course Extn Road

  • Tower
  • Tower

FEATURES OF THE PROJECTS

  • Located in Golf Course extension area, Sector 58, Gurgaon
  • Spread over 3 acres of lush green campus.
  • Total area 3,25,000 sq ft
  • Well-defined architectural facade, taking care of aesthetics as well as energy consumption, making it one of the upcoming landmark of the city
  • Centralized and segregated hub to cater to day-by-day business needs
  • 12 floors of unobstructed rectilinear floor plates, and attached terraces offering flexibility of design and function.
  • Multi-cuisine restaurants.
  • Roof top swimming pool & bar
  • Provision for Wi-fi and Networking
  • Incubation Centers
  • Bank and ATMs
  • Modular Kitchen

Living / Dining Room
Floor Natural Stone
Walls Pop punning with acrylic emulsion paint
Ceiling Acrylic emulsion paint
Bedroom
Floor Hardwood Flooring and matching skirting
Walls Pop punning with acrylic emulsion paint
Ceiling Acrylic emulsion paint
Kitchen
Floor Natural Stone
Walls Combination of tiles upto 2′-0′ above the counter and oil bound distemper in the balance area
Ceiling False ceiling Aluminum power coated
Balconies/Terraces
Floor Anti skied tiles/framed natural stone
Walls Tempered glass railing with handrail
Ceiling Weather proof paint
Toilet
Floor Natural Stone
Walls Natural Stone
Ceiling OFalse ceiling Aluminum power coated
Payment Plan
PAYMETN SCHEDULE – MIDRISE (Block A, C, G & J)
DOWN PAYMENT PLAN [7 ½ % rebate on Basic Sale Price PLC Parking]*
Stages Payment
At the time of Booking 10 % of Basic Sale Price
Within 45 days of booking 85 % of Basic Sale Price EDC IDC PLC Car parking
On Receipt of Occupation Certificate 05 % of Basic Sale Price RFMS Stamp duty & Registration charges
CONSTRUCTION LINKED PAYMENT PLAN
Linked Stage Payment
At the time of Booking 10% of Basic Sale Price
Within 45 days of Booking 10% of Basic Sale Price
On completion of excavation 10 % of Basic Sale Price 50% EDC 50% IDC
On completion of 1st floor roof slab 10 % of Basic Sale Price 30% EDC 30% IDC
On completion of 3rd floor roof slab 10 % of Basic Sale Price 20% EDC 20% IDC 50% PLC
On completion of 5th floor roof slab 10 % of Basic Sale Price 50% PLC
On completion of 6th floor roof slab 10 % of Basic Sale Price 50% Car parking
On completion of 7th floor roof slab 10 % of Basic Sale Price 50% Car parking
On completion of external plaster 10 % of Basic Sale Price
On completion of internal plaster 05 % of Basic Sales Price
On Receipt of Occupation Certificate 05 % of Basic Sale Price RFMS Stamp duty & Registration charges
PAYMETN SCHEDULE – SINGLE TOWER (Block B, D, F & H)
DOWN PAYMENT PLAN [7 ½ % rebate on Basic Sale Price PLC Parking]
Stages Payment
At the time of Booking 10 % of Basic Sale Price
Within 45 days of booking 85 % of Basic Sale Price EDC IDC PLC Car parking
On Receipt of Occupation Certificate 05 % of Basic Sale Price RFMS Stamp duty & Registration charges
CONSTRUCTION LINKED PAYMENT PLAN
Linked Statges Payment
At the time of Booking 10% of Basic Sale Price
Within 45 days of Booking 10% of Basic Sale Price
On completion of excavation 10 % of Basic Sale Price 50% EDC 50% IDC
On completion of Ground floor roof slab 7.5 % of Basic Sale Price 30% EDC 30% IDC
On completion of 4th floor roof slab 7.5 % of Basic Sale Price 20% EDC 20% IDC 50% PLC
On completion of 9th floor roof slab 7.5 % of Basic Sale Price 50% PLC
On completion of 12th floor roof slab 7.5 % of Basic Sale Price 50% Car parking
On completion of 15th floor roof slab 05 % of Basic Sale Price 50% Car parking
On completion of 18th floor roof slab 05 % of Basic Sale Price
On completion of 22nd floor roof slab 05 % of Basic Sales Price
On completion of 25th floor roof slab 05 % of Basic Sales Price
On completion of 28th floor roof slab 05 % of Basic Sales Price
On completion of external plaster 05 % of Basic Sales Price
On completion of internal plaster 05 % of Basic Sales Price
On Receipt of Occupation Certificate 05 % of Basic Sale Price RFMS Stamp duty & Registration charges
PAYMETN SCHEDULE – GRAND ARCH EAST & WEST WING
DOWN PAYMENT PLAN [7 ½ % rebate on Basic Sale Price PLC Parking]*
Stages Payment
At the time of Booking 10 % of Basic Sale Price
Within 45 days of booking 85 % of Basic Sale Price EDC IDC PLC Car parking
On Receipt of Occupation Certificate 05 % of Basic Sale Price RFMS Stamp duty & Registration charges
CONSTRUCTION LINKED PAYMENT PLAN*(Grand Arch)
Linked Statges Payment
At the time of Booking 10% of Basic Sale Price
Within 45 days of Booking 10% of Basic Sale Price
On completion of excavation 10 % of Basic Sale Price 50% EDC 50% IDC
On completion of Ground floor roof slab 7.5 % of Basic Sale Price 30% EDC 30% IDC
On completion of 4th floor roof slab 7.5 % of Basic Sale Price 20% EDC 20% IDC 50% PLC
On completion of 9th floor roof slab 7.5 % of Basic Sale Price 50% PLC
On completion of 12th floor roof slab 7.5 % of Basic Sale Price 50% Car parking
On completion of 15th floor roof slab 05 % of Basic Sale Price 50% Car parking
On completion of 18th floor roof slab 05 % of Basic Sale Price
On completion of 22nd floor roof slab 05 % of Basic Sales Price
On completion of 25th floor roof slab 05 % of Basic Sales Price
On completion of 28th floor roof slab 05 % of Basic Sales Price
On completion of external plaster 05 % of Basic Sales Price
On completion of internal plaster 05 % of Basic Sales Price
On Receipt of Occupation Certificate 05 % of Basic Sale Price RFMS Stamp duty & Registration charges
Property Features
  • House
© Copyright 2018 - 2018 | NGLC REALTECH | Development & Digital Marketing by Nurotech | All Rights Reserved |